Pressure Vessel & Process Equipment Manufacturer
Volumetric Heat Exchanger
Reboilers
U-Tube Heat Exchangers
Scraped Surface Heat Exchanger
heat-exchanger4
Finned Tube Heat Exchangers
Carbon Steel Reactors
Stainless Steel Reactors
Heating and Cooling Reactors
Vacuum Reactors
Jacketed Reactors
High-Pressure Reactors
Oil Water Separator
Gas-Liquid Separators
Cyclone Separators
mixing system
CIP Cleaning system
Heat Transfer system
Filtration system
Chemical Dosing system
Custom Storage Tanks
Backwash Filters
Precision Filter
Industrial Filtration System
Duplex Filter
Bag Filter
Candle Filter
Capabilities

The mature process of Enerquip

Our experts and engineers have been continuously challenging and improving our processes for decades, earning Enerquip a reputation for innovative design, efficient manufacturing, excellent quality, and outstanding customer service.

Not only do we sell equipment, but we also collaborate with you to plan your current and future needs. Do you need us to assess your existing equipment configuration and provide a detailed plan? We can do that as well.

Industries placeholder: hero

Our Process

placeholder
1
Design &Fabrication
Description ...
placeholder
2
Machining
Description ...
placeholder
3
Materials
Description ...
placeholder
4
Engineering
Description ...
placeholder
5
Quality Control
Description ...
placeholder
6
Safety
Description ...
placeholder
7
Logistics & Shipping
Description ...

Milestone plan

For larger or more complex projects, we will develop detailed milestone plans, covering design, procurement, processing, manufacturing and testing.

  • The start and end dates of each stage
  • The estimated delivery date. You can rest assured.
  • Internal reviews of key projects are conducted weekly.
  • Progress reports (with photos) are submitted every two weeks until final acceptance.

The reasons why you will like it: You always know the progress of the project. There are no surprises – only clear communication and confidence in delivering on time.

1

Design Process

We first hold a kick-off meeting to review your data sheet and ensure that the thermal design complies with ASME standards.

ASME standards and seismic/ball valve calculations are carried out in the Compress software.

The overall layout drawing will be delivered within 5-10 working days.

Virtual design review confirms the position of the ball valve and supports.

Reasons you will like it: Fewer surprises in the future and a custom-designed solution tailored to your needs.

2

Procurement Plan

After the design plan is approved, our engineers will issue the final bill of materials.

Reliable raw material and outsourcing supplier network

Common components for shortening the delivery period

Components with long delivery cycles (burners, pumps, special alloys) are marked early.

Reasons you will like it: Transparent delivery cycle and fewer project delays.

3

Quality Plan

We follow ASME Volume VIII Part 1 standards. Each step includes:

Material traceability

Certified welding process procedures and inspections

Hydraulic test procedures

Coordination with factory acceptance tests (FAT) with you

Reasons you will like it: Ensure the safety, compliance, and durability of your equipment.

4

Manufacturing Plan

The project will enter the production stage based on the delivery cycle:

Spare equipment: Delivered the next day

Heat exchangers/boiler tubes: 8-12 weeks

Large systems: 18-22 weeks

Reasons you will like it: Predictable schedule, allowing your operations to proceed smoothly.

5

Factory Acceptance Test

If necessary, we will develop a test plan. For heat exchangers, the plan includes:

Verifying dimensions, ball valve positions, and support structures

Reviewing documents, specifications, and data sheets

Hydraulic test (observed by an authorized third-party inspector, or you can witness if necessary)

Reasons you will like it: Independent verification before shipment to ensure your equipment meets expectations.

6

Start-up Support

Each equipment comes with installation instructions and free support via phone, email, or web conference.

On-site support and troubleshooting services for heat oil and asphalt heaters (optional).

Passivation treatment plan for stainless steel heat exchangers to enhance their corrosion resistance

Reasons you will like it: Smooth start-up, long-term reliability.

7

Transportation and Documentation

Safe packaging (pallet packaging or wooden box packaging, suitable for global transportation)

Domestic transportation in the United States: approximately 3 days

Shipping containers in compliance with ISPM-15 standards

Final document package will be completed for scanning, cataloging, and delivery within 1-2 weeks.

Reasons you will like it: No worries about logistics – your equipment is safely delivered, and all documents are complete.

Scroll to Top

Get A Free Quote Now !

Contact Form
If you have any questions, please do not hesitate to contatct with us.
Factory